FAQs

Kevin Brodie Services
  • How long does epoxy flooring last?

    When installed correctly and maintained according to guidelines, epoxy flooring typically lasts between 10 and 20 years or longer, with lifespan influenced by foot traffic volume and specific use conditions.
  • How long does epoxy installation take?

    For most residential applications, epoxy flooring installation requires 1 to 3 days to complete, with timing determined by surface preparation needs, necessary repairs, and the specific coating system selected.
  • Can epoxy be installed over damaged concrete?

    Epoxy systems can be applied over concrete with existing damage. We address cracks, pitting, and minor surface defects through repair procedures prior to installation, resulting in a smooth final surface.
  • Is epoxy flooring slippery?

    We incorporate anti-slip additives into epoxy systems to enhance traction and reduce slip hazards, particularly important for garage floors, workshop spaces, and commercial facilities.
  • What colors and finishes are available?

    Our epoxy options include solid color systems, decorative flake patterns, metallic finishes, and custom color combinations, with topcoat selections ranging from high-gloss to satin or matte sheens to suit your aesthetic preferences and functional requirements.
  • Do I need to move furniture before interior painting?

    We ask that you remove smaller items and valuables from the work area. Our crew can assist with relocating larger furniture pieces and will protect your flooring, fixtures, and other furnishings throughout the project.
  • How do I choose paint colors?

    We provide color consultation services and sample applications to assist you in selecting colors that work well with your home's design, natural and artificial lighting conditions, and individual preferences.
  • How long does an interior painting project take?

    Individual residential rooms typically require 1 to 2 days for completion. Project duration for larger spaces depends on square footage, surface preparation demands, and the number of paint coats required.